I 90 EB over I 90 EXIT 45 RAMPS
MM 45.8 ON I-90 · County 013, Massachusetts · Built 1957 · 3 Lanes · 23,994 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.153639, -72.638539
This bridge is in worse condition than 19.1% of bridges in County 013. The average bridge in Massachusetts is 0 years old; this one is 69 years old.
Nearby Bridges
I 90 WB over I 90 EXIT 45 RAMPS
Built 1957
HWY PROSPECT AVE over HWY RAMPS F/G & H
Built 1968
HWY I90&I91 CON over HWY PROSPECT AVE
Built 1968
HWY I90&I91 CON over HWY RAMP F TO I90
Built 1968
I 90 over US 5 RIVERDALE ST
Built 1957
HWY RP TO I90&91 over US 5 RIVERDALE ST
Built 1953
I 91 NB over I 90
Built 1967
I 91 SB over I 90
Built 1967
I 91 NB over HWY PROSPECT AVE
Built 1967
I 91 SB over HWY PROSPECT AVE
Built 1967
Bridge Details
- Structure #
- W210234K7DOTNBI
- Year Built
- 1957
- Reconstructed
- 1993
- Length
- 18.2 m (59.7 ft)
- Max Span
- 16.8 m
- Width
- 18.9 m (62 ft)
- Lanes
- 3
- Daily Traffic
- 23,994
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $119,000
- Total Project Cost
- $179,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.