I 91 NB over HWY PROSPECT AVE
MM 11.0 ON I-91 NB · County 013, Massachusetts · Built 1967 · 3 Lanes · 36,681 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.154733, -72.648269
This bridge is in worse condition than 19.1% of bridges in County 013. The average bridge in Massachusetts is 0 years old; this one is 59 years old.
Nearby Bridges
I 91 SB over HWY PROSPECT AVE
Built 1967
I 91 SB over I 90
Built 1967
I 91 NB over I 90
Built 1967
HWY BIRNIE AVE over I 90
Built 1957
HWY PROSPECT AVE over HWY RAMPS F/G & H
Built 1968
I 90 WB over I 90 EXIT 45 RAMPS
Built 1957
I 90 EB over I 90 EXIT 45 RAMPS
Built 1957
I 91 NB over I 91 RMP A TPK CONN
Built 1967
I 91 SB over I 91 RMP A TPK CONN
Built 1967
HWY I90&I91 CON over HWY RAMP F TO I90
Built 1968
Bridge Details
- Structure #
- W21038111DOTNBI
- Year Built
- 1967
- Length
- 25.4 m (83.3 ft)
- Max Span
- 24.4 m
- Width
- 17.1 m (56.1 ft)
- Lanes
- 3
- Daily Traffic
- 36,681
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,887,000
- Total Project Cost
- $4,331,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.