HWY BIRNIE AVE over I 90

MM 45.0 ON I-90 · County 013, Massachusetts · Built 1957 · 2 Lanes · 10,474 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
W210244K9DOTNBI
Year Built
1957
Reconstructed
1994
Length
55.8 m (183.1 ft)
Max Span
16.3 m
Width
12.3 m (40.4 ft)
Lanes
2
Daily Traffic
10,474
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,472,000
Total Project Cost
$6,709,000