HWY BIRNIE AVE over I 90
MM 45.0 ON I-90 · County 013, Massachusetts · Built 1957 · 2 Lanes · 10,474 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 6 | Satisfactory |
Location
42.153303, -72.653689
This bridge is in worse condition than 56.9% of bridges in County 013. The average bridge in Massachusetts is 0 years old; this one is 69 years old.
Nearby Bridges
I 91 SB over HWY PROSPECT AVE
Built 1967
I 91 SB over I 90
Built 1967
I 91 NB over HWY PROSPECT AVE
Built 1967
I 91 NB over I 90
Built 1967
I 91 SB over I 91 RMP A TPK CONN
Built 1967
I 91 NB over I 91 RMP A TPK CONN
Built 1967
I 90 WB over I 90 EXIT 45 RAMPS
Built 1957
I 90 EB over I 90 EXIT 45 RAMPS
Built 1957
HWY PROSPECT AVE over HWY RAMPS F/G & H
Built 1968
I 90 EB over HWY MORGAN RD
Built 1957
Bridge Details
- Structure #
- W210244K9DOTNBI
- Year Built
- 1957
- Reconstructed
- 1994
- Length
- 55.8 m (183.1 ft)
- Max Span
- 16.3 m
- Width
- 12.3 m (40.4 ft)
- Lanes
- 2
- Daily Traffic
- 10,474
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,472,000
- Total Project Cost
- $6,709,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.