I 190 SB over HWY PROSPECT ST

.8 MI WEST OF ST-12 · County 027, Massachusetts · Built 1979 · 3 Lanes · 13,071 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
W170261X6DOTNBI
Year Built
1979
Length
27.4 m (89.9 ft)
Max Span
25 m
Width
17.4 m (57.1 ft)
Lanes
3
Daily Traffic
13,071
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,163,000
Total Project Cost
$4,745,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.