I 190 SB & OFF RMP over HWY WOODLAND ST
400 FT W OF PHEASNT HIL R · County 027, Massachusetts · Built 1979 · 4 Lanes · 21,017 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 7 | Good |
Location
42.338375, -71.798378
This bridge is in worse condition than 60.4% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 47 years old.
Nearby Bridges
I 190 NB & ON RMP over HWY WOODLAND ST
Built 1979
I 190 SB over I 190 RAMP L (SB ON)
Built 1979
I 190 NB over I 190 RAMP L (SB ON)
Built 1979
I 190 RAMP N SB over I 190 RAMP L SB
Built 1979
I 190 SB over I 190 SB OFF RAMP N
Built 1979
I 190 NB over I 190 SB OFF RAMP N
Built 1979
I 190 SB over HWY MALDEN ST
Built 1975
I 190 NB over HWY MALDEN ST
Built 1975
I 190 SB over HWY PROSPECT ST
Built 1979
I 190 NB over HWY PROSPECT ST
Built 1979
Bridge Details
- Structure #
- W170251X4DOTNBI
- Year Built
- 1979
- Length
- 28 m (91.9 ft)
- Max Span
- 25.6 m
- Width
- 23.5 m (77.1 ft)
- Lanes
- 4
- Daily Traffic
- 21,017
- Material
- Prestressed Concrete
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $4,425,000
- Total Project Cost
- $6,638,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.