I 190 SB over I 190 RAMP L (SB ON)

@MM 4 / EXIT 4 · County 027, Massachusetts · Built 1979 · 3 Lanes · 13,214 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
W170231X1DOTNBI
Year Built
1979
Length
22.9 m (75.1 ft)
Max Span
20.1 m
Width
17.4 m (57.1 ft)
Lanes
3
Daily Traffic
13,214
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,599,000
Total Project Cost
$3,899,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.