HWY LNG PND RD over US 6 MID CAPE HWY

.2 MI E OF MAIN ST · County 001, Massachusetts · Built 1949 · 2 Lanes · 776 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 5 Fair
Superstructure 6 Satisfactory
Substructure 7 Good

Location

41.940428, -70.023122

This bridge is in worse condition than 65.4% of bridges in County 001. The average bridge in Massachusetts is 0 years old; this one is 77 years old.

Nearby Bridges

Bridge Details

Structure #
W140084BEDOTNBI
Year Built
1949
Length
43.3 m (142.1 ft)
Max Span
18.6 m
Width
11.9 m (39 ft)
Lanes
2
Daily Traffic
776
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,400,000
Total Project Cost
$5,101,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.