COAST GUARD BEACH over CRANBERRY BOG

1.5 MILES FROM SALT POND · County 001, Massachusetts · Built 1986 · 2 Lanes · 500 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
1730001P0000000
Year Built
1986
Length
94.5 m (310 ft)
Max Span
11.9 m
Width
11 m (36.1 ft)
Lanes
2
Daily Traffic
500
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
National Park Service
Last Inspected
N/A
Est. Improvement
$30,000
Total Project Cost
$45,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.