HWY CHEQUSST NCK over WATER HERRING RIVER

3 MI W OF RTE 6 · County 001, Massachusetts · Built 1973 · 2 Lanes · 1,034 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Culvert 6 Satisfactory

Location

41.930764, -70.064128

This bridge is in worse condition than 33.6% of bridges in County 001. The average bridge in Massachusetts is 0 years old; this one is 53 years old.

Nearby Bridges

Bridge Details

Structure #
W1400744BMUNNBI
Year Built
1973
Length
6.7 m (22 ft)
Max Span
2.1 m
Lanes
2
Daily Traffic
1,034
Material
Concrete
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$305,000
Total Project Cost
$458,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.