I 495 SB over WATER WEWEANTIC RIVER

0.5 M S OF RTE 58 · County 023, Massachusetts · Built 1964 · 2 Lanes · 17,786 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
W0603446CDOTNBI
Year Built
1964
Length
23.5 m (77.1 ft)
Max Span
7.6 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
17,786
Material
Concrete Continuous
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,026,000
Total Project Cost
$3,040,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.