I 495 NB over HWY CHARLOTTE FURNC RD

1.5 M S OF RTE 58 · County 023, Massachusetts · Built 1966 · 2 Lanes · 18,356 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
W06041469DOTNBI
Year Built
1966
Length
24.4 m (80.1 ft)
Max Span
22.9 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
18,356
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$468,000
Total Project Cost
$703,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.