ST 58 TREMONT ST over WATER WEWEANTIC RIVER

AT WAREHAM LINE · County 023, Massachusetts · Built 1953 · 2 Lanes · 11,857 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
C0400341KMUNNBI
Year Built
1953
Length
17.1 m (56.1 ft)
Max Span
5.5 m
Width
14.8 m (48.6 ft)
Lanes
2
Daily Traffic
11,857
Material
Concrete Continuous
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,730,000
Total Project Cost
$2,596,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.