US 1 BOSTON ST over HWY HOWLETT ST

.8 MI N IPSWICH RIVER · County 009, Massachusetts · Built 1922 · 2 Lanes · 15,400 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
T060062TJDOTNBI
Year Built
1922
Length
6.7 m (22 ft)
Max Span
6.1 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
15,400
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$478,000
Total Project Cost
$718,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.