ST 97 HIGH ST over WATER IPSWICH RIVER

.8 MI E OF US-1 · County 009, Massachusetts · Built 1920 · 2 Lanes · 12,600 vehicles/day

Overall
Fair
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
T060042Y3DOTNBI
Year Built
1920
Length
14.6 m (47.9 ft)
Max Span
14.6 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
12,600
Material
Concrete
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,005,000
Total Project Cost
$1,508,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.