HWY ESSEX ST over RR MBTA/BMRR

.5 MI SOUTH DANVERS RD · County 009, Massachusetts · Built 1943 · 2 Lanes · 21,900 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
5
Fair
Superstructure
4
Poor
Substructure
6
Satisfactory

Bridge Details

Structure #
S3400232YDOT634
Year Built
1943
Reconstructed
1996
Length
12.8 m (42 ft)
Max Span
11.6 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
21,900
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,701,000
Total Project Cost
$4,052,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.