ST107 WESTERN AVE over WATER GLENMERE LAKE

.64 KM S SALEM CITY LINE · County 009, Massachusetts · Built 1921 · 2 Lanes · 25,200 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
L1801931ADOTNBI
Year Built
1921
Length
158.8 m (521 ft)
Max Span
2.1 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
25,200
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$15,690,000
Total Project Cost
$23,536,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.