I 84 WB over WATER QUINEBAUG RIVER

1 MI. SOUTH OF U.S.-20 · County 027, Massachusetts · Built 1970 · 4 Lanes · 28,923 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
S300401PMDOTNBI
Year Built
1970
Length
32.6 m (107 ft)
Max Span
30.8 m
Width
18.3 m (60 ft)
Lanes
4
Daily Traffic
28,923
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,921,000
Total Project Cost
$5,882,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.