ST 15 HAYNES ST over WATER QUINEBAUG RIVER
.25 MI N OF RIVER RD · County 027, Massachusetts · Built 1961 · 2 Lanes · 1,400 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.097339, -72.085544
This bridge is in worse condition than 11.5% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 65 years old.
Nearby Bridges
I 84 EB over WATER QUINEBAUG RIVER
Built 1970
I 84 WB over WATER QUINEBAUG RIVER
Built 1970
HWY RIVER RD over I 84 EB
Built 1970
HWY RIVER RD over I 84 WB
Built 1970
HWY FARQUHAR RD over WATER QUINEBAUG RIVER
Built 1938
ST131 MAIN ST over WATER HOBBS BROOK
Built 1960
I 84 EB over ST131 MAIN ST
Built 1973
I 84 WB over ST131 MAIN ST
Built 1973
HWY STALLION HLL over WATER QUINEBAUG RIVER
Built 1957
I 84 WB over US 20 EB/CHARLTON RD
Built 1973
Bridge Details
- Structure #
- S300041M5DOTNBI
- Year Built
- 1961
- Reconstructed
- 2011
- Length
- 44.4 m (145.7 ft)
- Max Span
- 23.5 m
- Width
- 13.7 m (44.9 ft)
- Lanes
- 2
- Daily Traffic
- 1,400
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,473,000
- Total Project Cost
- $2,210,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.