HWY FARQUHAR RD over WATER QUINEBAUG RIVER
.5 MI SW OF RTE 131 · County 027, Massachusetts · Built 1938 · 1 Lanes · 1,100 vehicles/day
Overall
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 5 | Fair |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.09355, -72.078919
This bridge is in worse condition than 60.4% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 88 years old.
Nearby Bridges
ST 15 HAYNES ST over WATER QUINEBAUG RIVER
Built 1961
I 84 EB over WATER QUINEBAUG RIVER
Built 1970
HWY RIVER RD over I 84 EB
Built 1970
I 84 WB over WATER QUINEBAUG RIVER
Built 1970
HWY RIVER RD over I 84 WB
Built 1970
ST131 MAIN ST over WATER HOBBS BROOK
Built 1960
I 84 EB over ST131 MAIN ST
Built 1973
I 84 WB over ST131 MAIN ST
Built 1973
I 84 WB over US 20 EB/CHARLTON RD
Built 1973
I 84 EB over US 20 EB/CHARLTON RD
Built 1974
Bridge Details
- Structure #
- S300034WDMUNNBI
- Year Built
- 1938
- Reconstructed
- 1956
- Length
- 11 m (36.1 ft)
- Max Span
- 10.1 m
- Width
- 5.5 m (18 ft)
- Lanes
- 1
- Daily Traffic
- 1,100
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,275,000
- Total Project Cost
- $3,413,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.