I 190 SB over HWY ROWLEY HILL RD

@ MILE MARKER 12.8 · County 027, Massachusetts · Built 1980 · 2 Lanes · 17,787 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
5
Fair
Substructure
7
Good

Bridge Details

Structure #
S250281WLDOTNBI
Year Built
1980
Length
25.3 m (83 ft)
Max Span
22.9 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
17,787
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,313,000
Total Project Cost
$3,470,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.