I 190 SB over ST 62 PRINCETON RD

1 MILE WEST OF STATE 12 · County 027, Massachusetts · Built 1980 · 2 Lanes · 15,728 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
S250271WKDOTNBI
Year Built
1980
Length
34.1 m (111.9 ft)
Max Span
31.4 m
Width
13.7 m (44.9 ft)
Lanes
2
Daily Traffic
15,728
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$623,000
Total Project Cost
$935,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.