I 190 NB over RR CSX

0.1 MI N OF ST-12 · County 027, Massachusetts · Built 1978 · 3 Lanes · 20,575 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
S250301WQDOTNBI
Year Built
1978
Length
38.4 m (126 ft)
Max Span
36.6 m
Width
14.6 m (47.9 ft)
Lanes
3
Daily Traffic
20,575
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,697,000
Total Project Cost
$5,546,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.