ST140 RDMPTN ROCK over WATER WACHUSETT BROOK

.5 MILE NORTH OF ST 62 · County 027, Massachusetts · Built 2003 · 2 Lanes · 6,808 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
S25016AN7DOTNBI
Year Built
2003
Length
16.8 m (55.1 ft)
Max Span
15 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
6,808
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,086,000
Total Project Cost
$1,630,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.