ST 62 PRINCETON RD over WATER STILLWATER RIVER

.1MI. E. OF ST-140 · County 027, Massachusetts · Built 2011 · 2 Lanes · 2,835 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
S25006B9UDOTNBI
Year Built
2011
Length
14.8 m (48.6 ft)
Max Span
12.6 m
Width
10.1 m (33.1 ft)
Lanes
2
Daily Traffic
2,835
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,005,000
Total Project Cost
$1,508,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.