HWY ALPINE DR over WATER LEBANON BROOK

1 MI. N. OF CT. LINE · County 027, Massachusetts · Built 2012 · 2 Lanes · 1,163 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
8
Very Good
Substructure
7
Good

Bridge Details

Structure #
S21033B1UMUNNBI
Year Built
2012
Length
13.8 m (45.3 ft)
Max Span
12.9 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
1,163
Material
Prestressed Concrete
Design
Box Beam or Girders - Single or Spread
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,375,000
Total Project Cost
$2,063,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.