HWY MILL ST over WATER MCKINSTRY BROOK

300 FT SOUTH OF RIVER ST · County 027, Massachusetts · Built 1940 · 2 Lanes · 517 vehicles/day

Structurally Deficient — One or more key components rated 4 (Poor) or below
Overall
Poor
Deck
4
Poor
Superstructure
4
Poor
Substructure
4
Poor

Bridge Details

Structure #
S210091HCMUNNBI
Year Built
1940
Reconstructed
1985
Length
15.5 m (50.9 ft)
Max Span
7.3 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
517
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$1,320,000
Total Project Cost
$1,981,000