HWY MILL ST over WATER QUINEBAUG RIVER

200 FT. NORTH OF ST-131 · County 027, Massachusetts · Built 1956 · 2 Lanes · 682 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
S210031HBMUNNBI
Year Built
1956
Length
27.4 m (89.9 ft)
Max Span
25.9 m
Width
12.5 m (41 ft)
Lanes
2
Daily Traffic
682
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$2,280,000
Total Project Cost
$3,421,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.