ST116 AMHERST RD over WATER BACHELOR BROOK

.3 M S GRANBY-HADLEY T.L. · County 015, Massachusetts · Built 1956 · 2 Lanes · 8,534 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
S180050VJDOTNBI
Year Built
1956
Length
12 m (39.4 ft)
Max Span
11.5 m
Width
9.8 m (32.2 ft)
Lanes
2
Daily Traffic
8,534
Material
Prestressed Concrete
Design
Slab
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$828,000
Total Project Cost
$1,243,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.