HWY BURNETT ST over WATER BATCHELOR BROOK

0.36 M S OF RT 116 · County 015, Massachusetts · Built 1956 · 2 Lanes · 1,551 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
G090010Q3MUNNBI
Year Built
1956
Length
11.9 m (39 ft)
Max Span
11.3 m
Width
6.1 m (20 ft)
Lanes
2
Daily Traffic
1,551
Material
Prestressed Concrete
Design
Slab
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$476,000
Total Project Cost
$715,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.