HWY AMHERST ST over WATER ALDRICH LAKE

.5 MI S OF RTE 116 · County 015, Massachusetts · Built 1952 · 2 Lanes · 10,086 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
G090020LJMUNNBI
Year Built
1952
Length
12.8 m (42 ft)
Max Span
6.1 m
Lanes
2
Daily Traffic
10,086
Material
Steel
Design
Culvert
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$665,000
Total Project Cost
$998,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.