HWY BOWDOIN ST over WATER RAWSON HILL BROOK

500 FT N OF RESERVOIR ST · County 027, Massachusetts · Built 1990 · 2 Lanes · 300 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
S14025AEXMUNNBI
Year Built
1990
Length
12.2 m (40 ft)
Max Span
12.2 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
300
Material
Concrete
Design
Arch - Deck
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$750,000
Total Project Cost
$1,126,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.