I 290 WB over HWY RESERVOIR ST

@MM 26.5/W OF CHURCH ST · County 027, Massachusetts · Built 1968 · 3 Lanes · 47,712 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B200031R3DOTNBI
Year Built
1968
Length
24.4 m (80.1 ft)
Max Span
22.6 m
Width
17.7 m (58.1 ft)
Lanes
3
Daily Traffic
47,712
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,169,000
Total Project Cost
$1,754,000