HWY RESERVOIR ST over I 290 EB

@MM 26.5/W OF CHURCH ST · County 027, Massachusetts · Built 1968 · 2 Lanes · 3,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
B2000220TDOTNBI
Year Built
1968
Length
36 m (118.1 ft)
Max Span
33.5 m
Width
12.6 m (41.3 ft)
Lanes
2
Daily Traffic
3,800
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,027,000
Total Project Cost
$4,541,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.