ST 27 DEPOT ST over RR AMTRAK/MBTA

AT RAILROAD STATION · County 021, Massachusetts · Built 2002 · 2 Lanes · 23,275 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
S09004ACYDOT634
Year Built
2002
Length
74.7 m (245.1 ft)
Max Span
18.8 m
Width
13.6 m (44.6 ft)
Lanes
2
Daily Traffic
23,275
Material
Prestressed Concrete
Design
Box Beam or Girders - Multiple
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,025,000
Total Project Cost
$7,538,000