HWY QUKR MTNG HS over US 6 WB MID CAPE HWY

2.7 M W OF BARNSTABLE TL · County 001, Massachusetts · Built 1950 · 2 Lanes · 7,785 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
S040074BBDOTNBI
Year Built
1950
Length
19.5 m (64 ft)
Max Span
17.1 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
7,785
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,559,000
Total Project Cost
$2,339,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.