ST149 MTNG HSE WAY over US 6 WB/MID CAPE HWY

1.75 M E OF SANDWICH TL · County 001, Massachusetts · Built 1950 · 2 Lanes · 12,357 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B0101149TDOTNBI
Year Built
1950
Length
18.7 m (61.4 ft)
Max Span
15.8 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
12,357
Material
Concrete
Design
Frame (except frame culverts)
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$809,000
Total Project Cost
$1,214,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.