ST 6 A/CRNBRY HWY over WATER SCORTON RIVER

1.7 M N OF BARNSTABLE TL · County 001, Massachusetts · Built 1926 · 2 Lanes · 4,214 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
S040014A4DOTNBI
Year Built
1926
Length
20.7 m (67.9 ft)
Max Span
9.1 m
Width
10.5 m (34.4 ft)
Lanes
2
Daily Traffic
4,214
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,432,000
Total Project Cost
$2,149,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.