US 6 EB/MD CP HWY over HWY PHINNEYS LN

1.5 M E OF RTE 132 · County 001, Massachusetts · Built 1966 · 2 Lanes · 24,674 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
B0101546JDOTNBI
Year Built
1966
Length
40.5 m (132.9 ft)
Max Span
16.2 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
24,674
Material
Concrete Continuous
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$767,000
Total Project Cost
$1,151,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.