ST127 GRANITE ST over RR RGCO RR (ABAND)

.8 MI N ROCKPORT CENTER · County 009, Massachusetts · Built 1872 · 2 Lanes · 11,000 vehicles/day

Overall
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
R0900130PDOTNBI
Year Built
1872
Length
15.8 m (51.8 ft)
Max Span
15.8 m
Width
9.3 m (30.5 ft)
Lanes
2
Daily Traffic
11,000
Material
Masonry
Design
Arch - Deck
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,297,000
Total Project Cost
$1,946,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.