HWY W SQUANTM ST over TR RED LINE SSH
1.0 MIE. JCT. GRANITE AVE · County 021, Massachusetts · Built 1969 · 4 Lanes · 11,700 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 5 | Fair |
| Substructure | 5 | Fair |
Location
42.274789, -71.029189
This bridge is in worse condition than 64.4% of bridges in County 021. The average bridge in Massachusetts is 0 years old; this one is 57 years old.
Nearby Bridges
HWY W SQUA ON RP over OTHER PARKING
Built 1969
HWY W SQUANTM ST over HWY NEWPORT AVE
Built 1969
HWY W SQU OFF RP over OTHER RELIEF
Built 1969
HWY HANCOCK ST over COMB SGMRE ST&MBTA&REDS
Built 1969
HWY QUINCY SHORE over OTHER PARKING
Built 1970
HWY QUINCY SHORE over ST 3 A/HNCK NB&MBTA&RED
Built 1970
ST 3 A/HNCK OFFRP over OTHER RELIEF
Built 1970
ST 3 A/HANCK ONRP over OTHER RELIEF
Built 1970
HWY BEALE ST over TR RED LINE SSH
Built 1968
ST 3 A/MORRSY BLV over COMB NEPONSET AVE&RIVER
Built 1970
Bridge Details
- Structure #
- Q010034UBMBTNBI
- Year Built
- 1969
- Length
- 43.7 m (143.4 ft)
- Max Span
- 22.4 m
- Width
- 19.1 m (62.7 ft)
- Lanes
- 4
- Daily Traffic
- 11,700
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Other State Agencies
- Last Inspected
- N/A
- Est. Improvement
- $5,456,000
- Total Project Cost
- $8,185,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.