HWY BEALE ST over TR RED LINE SSH

0.04 MI NE OF NEWPORT AVE · County 021, Massachusetts · Built 1968 · 4 Lanes · 25,600 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
Q010044UCMBTNBI
Year Built
1968
Length
18.3 m (60 ft)
Max Span
18.3 m
Width
22 m (72.2 ft)
Lanes
4
Daily Traffic
25,600
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Other State Agencies
Last Inspected
N/A
Est. Improvement
$2,714,000
Total Project Cost
$4,072,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.