HWY CLARK RD over ST 3 PILGRIM HWY

8 MI S OF RTE 44 · County 023, Massachusetts · Built 1956 · 2 Lanes · 14,858 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
P130364ACDOTNBI
Year Built
1956
Reconstructed
1986
Length
55.5 m (182.1 ft)
Max Span
21.3 m
Width
15.8 m (51.8 ft)
Lanes
2
Daily Traffic
14,858
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,745,000
Total Project Cost
$8,618,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.