HWY BRIDGE ST over WATER CHICOPEE RIVER

JUST N OF MAIN ST · County 013, Massachusetts · Built 1964 · 2 Lanes · 2,000 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
P0100415YMUNNBI
Year Built
1964
Length
73.2 m (240.2 ft)
Max Span
23.5 m
Width
12.9 m (42.3 ft)
Lanes
2
Daily Traffic
2,000
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
Town or Township Highway Agency
Last Inspected
N/A
Est. Improvement
$6,198,000
Total Project Cost
$9,298,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.