HWY BRIDGE ST over WATER CHICOPEE RIVER
JUST N OF MAIN ST · County 013, Massachusetts · Built 1964 · 2 Lanes · 2,000 vehicles/day
Overall
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
42.180972, -72.366514
This bridge is in worse condition than 19.1% of bridges in County 013. The average bridge in Massachusetts is 0 years old; this one is 62 years old.
Nearby Bridges
HWY MAIN ST over WATER QUABOAG RIVER
Built 1948
ST181 PALMER ST over WATER WARE RIVER
Built 1938
HWY CALKINS RD over I 90
Built 1957
HWY PALMER RD over WATER QUABOAG RIVER
Built 1957
I 90 WB over WATER QUABOAG RIVER
Built 1957
I 90 EB over WATER QUABOAG RIVER
Built 1957
I 90 WB over RR NECRR & MCRR
Built 1957
I 90 EB over RR NECRR & MCRR
Built 1957
I 90 WB over ST181 N MAIN ST
Built 1957
I 90 EB over ST181 N MAIN ST
Built 1957
Bridge Details
- Structure #
- P0100415YMUNNBI
- Year Built
- 1964
- Length
- 73.2 m (240.2 ft)
- Max Span
- 23.5 m
- Width
- 12.9 m (42.3 ft)
- Lanes
- 2
- Daily Traffic
- 2,000
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $6,198,000
- Total Project Cost
- $9,298,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.