HWY SLMN PND RD over I 290

AT EXIT 30 I-290 · County 027, Massachusetts · Built 1968 · 4 Lanes · 6,822 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
N2002720EDOTNBI
Year Built
1968
Reconstructed
1996
Length
91.4 m (299.9 ft)
Max Span
33.5 m
Width
20.7 m (67.9 ft)
Lanes
4
Daily Traffic
6,822
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$12,364,000
Total Project Cost
$18,547,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.