I 290 WB over COMB MDC AQUEDUCT & CSX

MM 17.3 · County 027, Massachusetts · Built 1968 · 3 Lanes · 37,304 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
5
Fair

Bridge Details

Structure #
N200251R8DOTNBI
Year Built
1968
Length
53.7 m (176.2 ft)
Max Span
33 m
Width
17.1 m (56.1 ft)
Lanes
3
Daily Traffic
37,304
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,002,000
Total Project Cost
$9,004,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.