HWY DONALD LYNCH over WATER ASSABET RIVER

ENTRANCE TO SOL POND MALL · County 017, Massachusetts · Built 1984 · 3 Lanes · 8,400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
M06023AX4MUNNBI
Year Built
1984
Length
19.5 m (64 ft)
Max Span
17.7 m
Width
16.4 m (53.8 ft)
Lanes
3
Daily Traffic
8,400
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$1,185,000
Total Project Cost
$1,778,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.