US 20 MAIN ST over WATER WACHUSETT AQUEDUCT

0.3 MI W OF BARTLETT ST · County 027, Massachusetts · Built 1931 · 2 Lanes · 10,825 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
N200171KYDOTNBI
Year Built
1931
Reconstructed
2014
Length
15.5 m (50.9 ft)
Max Span
14 m
Width
13.4 m (44 ft)
Lanes
2
Daily Traffic
10,825
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$225,000
Total Project Cost
$338,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.