HWY REG DAM RD over WATER QUABBIN RES

.4 MI SW OF ST122 GATE 31 · County 011, Massachusetts · Built 1940 · 1 Lanes

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
N090034CLDOTNBI
Year Built
1940
Length
12.5 m (41 ft)
Max Span
11.6 m
Width
3.7 m (12.1 ft)
Lanes
1
Material
Concrete
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$970,000
Total Project Cost
$1,456,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.