HWY WHITE POND over WATER WHITE POND OUT
0.1 M S OF KING ST · County 027, Massachusetts · Built 2004 · 2 Lanes · 517 vehicles/day
Overall
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.5508, -72.263603
This bridge is in worse condition than 11.5% of bridges in County 027. The average bridge in Massachusetts is 0 years old; this one is 22 years old.
Nearby Bridges
ST 2 over WATER LAKE ROHUNTA
Built 1955
ST 2 over HWY WHITE POND RD
Built 1954
ST 2 over HWY S ATHOL RD
Built 1954
ST 2 over ST202
Built 2023
HWY WASHNGTN AVE over WATER S ATHOL PND OUTLET
Built 2020
HWY DANIEL SHAYS over WATER LAKE ROHNTA OUTLET
Built 1955
HWY MORGAN AVE over WATER S ATHOL PND OUTLET
Built 1979
HWY DANIEL SHAYS over WATER MILLERS RIVER
Built 1935
ST 2 over ST122 S MAIN ST
Built 1955
HWY DAN SHAY HWY over RR GWRR
Built 1990
Bridge Details
- Structure #
- A150225YBMUNNBI
- Year Built
- 2004
- Length
- 9.8 m (32.2 ft)
- Max Span
- 9.8 m
- Width
- 10.7 m (35.1 ft)
- Lanes
- 2
- Daily Traffic
- 517
- Material
- Concrete
- Design
- Frame (except frame culverts)
- Owner
- Town or Township Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $390,000
- Total Project Cost
- $586,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.