ST 2 over ST122 S MAIN ST

MM 69.7 ON ST 2 · County 011, Massachusetts · Built 1955 · 4 Lanes · 9,117 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
O030220W0DOTNBI
Year Built
1955
Reconstructed
2011
Length
29.2 m (95.8 ft)
Max Span
27.3 m
Width
19.2 m (63 ft)
Lanes
4
Daily Traffic
9,117
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,823,000
Total Project Cost
$2,735,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.