ST 2 over ST122 S MAIN ST
MM 69.7 ON ST 2 · County 011, Massachusetts · Built 1955 · 4 Lanes · 9,117 vehicles/day
Overall
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 7 | Good |
| Superstructure | 7 | Good |
| Substructure | 7 | Good |
Location
42.558589, -72.301506
This bridge is in worse condition than 12.4% of bridges in County 011. The average bridge in Massachusetts is 0 years old; this one is 71 years old.
Nearby Bridges
ST 2 over ST202
Built 2023
HWY FAY RD over WATER N BR SWIFT RIVER
Built 1987
ST 2 over WATER LAKE ROHUNTA
Built 1955
ST 2 over HWY LAKE MATTAWA RD
Built 1956
HWY DANIEL SHAYS over WATER LAKE ROHNTA OUTLET
Built 1955
ST 2 over HWY WHITE POND RD
Built 1954
HWY WHITE POND over WATER WHITE POND OUT
Built 2004
HWY BROOKSIDE RD over RR GWRR
Built 1923
ST122 S MAIN ST over WATER MILLERS RIVER
Built 1937
ST122 S MAIN ST over RR GWRR
Built 1930
Bridge Details
- Structure #
- O030220W0DOTNBI
- Year Built
- 1955
- Reconstructed
- 2011
- Length
- 29.2 m (95.8 ft)
- Max Span
- 27.3 m
- Width
- 19.2 m (63 ft)
- Lanes
- 4
- Daily Traffic
- 9,117
- Material
- Steel
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $1,823,000
- Total Project Cost
- $2,735,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.